Centralized Grid-connected Photovoltaic Power Station
Make full use of the rich and relatively stable solar energy resources in desert areas to build large-scale photovoltaic power stations, and connect to high-voltage transmission systems to supply long-distance loads. The site selection is more flexible, the stability is increased, and the positive peak-shaving characteristics of solar radiation and power load can be fully utilized to play a role in peak shaving. The operation mode is relatively flexible. Compared with distributed photovoltaics, it is more convenient to perform reactive power and voltage control, and it is also easier to participate in grid frequency regulation. The construction period is short, the environmental adaptability is strong, the operating cost is low, it is easy to centrally manage, and it is less restricted by space, so it can be easily expanded.
READ MORE + 白箭头 黑箭头
前ページへ
1

Tel:0086-534-5045999400-838-5657

Website:Http://www.jieyangsolar.com

Mail : jygk2008@163.com

Address : No. 5888, Dongfanghong East Road, Tianqu New District, Dezhou, Shandong, China

Travel route : Take bus No. K1, 101, 107, 112, 116, etc. and get off at "Jieyang New Energy Station".

 

Copyright © Shandong Jieyang New Energy Co., Ltd. |  All Rights Reserved   |  备案号:鲁ICP备12025591号-19

 

Service Hotline

400-838-5657

WeChat Official Account

Service Hotline

400-838-5657

WeChat Official Account

 

Copyright © 山东洁阳新能源股份有限公司  |  All Rights Reserved   |  备案号:鲁ICP备12025591号-19